Under construction
Detached house with garage in Haßloch
The earthworks are complete and the basement is in place. Drainage work is next.
Haßloch, Palatinate Earthworks, basement and drainage
- Location
- Haßloch, Palatinate
- Services
- Earthworks, basement
and drainage - Construction progress
- Basement installed
- Next step
- Drainage
Current construction progress
A detached house with a garage is being built in Haßloch. These photographs show progress after the basement was installed.
-
Earthworks
The basement excavation is complete. The working space around the basement walls remains open.
-
Basement installed
The basement is in place. Insulation panels and light wells are visible along the exterior walls.
-
Drainage work to follow
Drainage work is the next step. It has not yet been carried out at the construction stage shown.
Views of the construction site
01 / 08
Installed basement with open working space around it