Detached house with garage in Haßloch

The earthworks are complete and the basement is in place. Drainage work is next.

Haßloch, Palatinate Earthworks, basement and drainage

Location
Haßloch, Palatinate
Services
Earthworks, basement
and drainage
Construction progress
Basement installed
Next step
Drainage
Open working space between the insulated basement wall and the sheet-covered excavation slope
Open working space along the basement wall.

Current construction progress

A detached house with a garage is being built in Haßloch. These photographs show progress after the basement was installed.

  1. Earthworks

    The basement excavation is complete. The working space around the basement walls remains open.

  2. Basement installed

    The basement is in place. Insulation panels and light wells are visible along the exterior walls.

  3. Drainage work to follow

    Drainage work is the next step. It has not yet been carried out at the construction stage shown.

Detached house in Haßloch